Mica Wall-Spout Combo - Straight Spout - 2P - TRIM KIT ONLY

Save 15%
Bella VistaSKU: WBS-51-2P-CP-TK

Colour: Chrome
Price:
Sale price$127.50 Regular price$150.00
American Express Apple Pay Google Pay Mastercard PayPal Shop Pay Union Pay Visa

Mica Wall-Spout Combo - Straight Spout - 2P - TRIM KIT ONLY by Bella Vista is a refined bathroom fixture designed to deliver a clean, modern aesthetic with dependable performance. Featuring a sleek straight spout and dual control configuration, it provides both visual appeal and practical functionality, making it an excellent choice for contemporary basin or bath installations.

Constructed from premium lead free materials, this trim kit ensures safe water delivery while maintaining durability for long-term use. The design incorporates a streamlined wall-mounted spout paired with precision-engineered controls, offering smooth and reliable operation. Supplied with a standard 185mm spout, it delivers optimal reach and balanced water flow for everyday comfort.

Available in Chrome and Black, the Mica Wall-Spout Combo - Straight Spout - 2P - TRIM KIT ONLY allows for seamless integration into a variety of modern bathroom styles. Designed to coordinate effortlessly with the Bella Vista Mica collection, it is suitable for both new builds and renovation projects. This trim kit requires a compatible in-wall mixer body for installation and is backed by a lifetime warranty across all finishes, ensuring confidence in quality and performance.

Key Features:
• Requires Mixer Body for installation
• Lead Free construction for safer water delivery
• 185mm spout supplied as standard
• WELS Rating: 4 star / 6.5 L/min
• WELS Registration Number: T41402
• Dual control design for precise water management
• Straight spout profile for a modern, minimalist look
• Durable construction for long-lasting reliability
• Corrosion-resistant finish suitable for wet environments

 

Industry Advice
Industry Advice
Confused how to install? Need a professional input? Contact our experts’ team.
Fast and secure shipping
Fast and secure shipping
Pan-Australia delivery – We dispatch your order within 3-5 working days.
Secure payments
Secure payments
Multiple trusted payment options for a smooth checkout experience.
Top notch
Top notch
Need advice? Our in-house experts are just a call or visit away.
Need Assistance

Need Help Choosing The Perfect Tile

Speak to of of our Niche tile experts today.

Book Free Consultation

Shipping

Yes, we ship all over the world. Shipping costs will apply, and will be added at checkout. We run discounts and promotions all year, so stay tuned for exclusive deals.

It depends on where you are. Orders processed here will take 5-7 business days to arrive. Overseas deliveries can take anywhere from 7-16 days. Delivery details will be provided in your confirmation email.

We use all major carriers, and local courier partners. You’ll be asked to select a delivery method during checkout.

Product

We always aim for make sure our customers love our products, but if you do need to return an order, we’re happy to help. Just email us directly and we’ll take you through the process.

It depends on the creator and the product. All options are outlined on the product page, so look out for customization options there.

Other

You can contact us through our contact page! We will be happy to assist you.

Recently viewed